Stone loading, shipping & dispatch LOAD IT. THE PAPERWORK IS DONE.

Every bundle is scanned as it goes into the container. Weight is checked up to the limit, and the CMR, packing list and invoice come out as soon as the doors close.

Shipping · SH-0427Plan
Plan: 6 bundles · 27.6 t

Weight · container 10.0/ 28 t

Limit 28 t
  • Front axles· / 11.5 t

  • Rear axles· / 24.0 t

In container 1

  • 71

    4.4 t

  • 73

    4.6 t

  • 75

    4.7 t

  • 77

    4.5 t

  • 79

    4.8 t

  • 81

    4.6 t

SH-0427Drama → Dubai

11 bundles · 54.9 t · 2 containers

Loading planStrata AI

  • Container 127.6 t

    6 × Aphrodite · 2 cm

  • Container 227.3 t

    5 × Damastas · 3 cm

In the yard's order: 3 containersOne fewer container to ship

  • Plan: 2 containers instead of 308:30
  • 26 bundles scanned at the door10:15
  • 3Weighbridge 27.64 t · axles fine11:40
  • 46 documents, as the door closes12:05
  • 5The client is told12:10

Step 1 of 5: Plan

containers for the same shipment, with Strata AI
2 not 3
every container full to the limit, never over
27.6 / 28 t
bundles scanned at the container door
11 / 11
documents ready as soon as the door closes
6

Illustrative scenario

One shipment, one morning

11 bundles for Dubai. Two containers instead of three, and the paperwork ready before the truck leaves.

  1. 108:30

    Two containers instead of three.

    Shipment SH-0427 has 11 bundles, 54.9 metric tons. In the yard's order it needs three containers, the third for a single bundle. Strata AI puts the six 2 cm Aphrodite bundles in one and the five 3 cm Damastas in the other: 27.6 and 27.3 metric tons.

  2. 210:15

    The wrong bundle stops at the door.

    Every bundle is scanned as it goes in. Bundle 76 came to container 1, but it belongs in container 2: the phone stops it. Had it gone in, the container would have weighed 33.1 metric tons.

  3. 311:40

    The weighbridge says what you already knew.

    27.6 metric tons in the plan, 27.64 on the weighbridge. You knew the weight from the slabs before the truck arrived. The axles are within their limits.

  4. 412:05

    The door closes, the paperwork is ready.

    CMR, packing list, invoice, VGM, certificate of origin and the passports of all 82 slabs. From the bundles that were loaded, with no typing.

  5. 512:10

    The client sees it.

    The truck leaves for the port and the client in Dubai gets a message by email, SMS or WhatsApp. In the Portal they see what was loaded, with photos, and the documents.

1 / 5

01Loading plan

Fewer containers, lower freight costs.

Strata AI knows what every bundle weighs and fills each container up to the limit, never over. The same shipment needs two containers instead of three.

  • Every container up to the limit
  • Which bundle where, and in what order
  • One fewer container to ship
SH-0427 · 11 bundles in 28 t containers54.9 t
  • Aphrodite · 2 cm
  • Damastas · 3 cm
  • Limit 28 t
  1. Container 124.5 t 3.5 t empty
    • 71
    • 72
    • 73
    • 74
    • 75
  2. Container 225.8 t 2.2 t empty
    • 76
    • 77
    • 78
    • 79
    • 80
  3. Container 34.6 t for one bundle
    • 81

Container shipments32

Space you pay for, empty29.1 t1.1 t

SH-0427 · 11 bundles in 28 t containers
BundleMaterialtIn the yard's orderStrata AI
71Aphrodite 2 cm4.4Container 1Container 1
72Damastas 3 cm5.2Container 1Container 2
73Aphrodite 2 cm4.6Container 1Container 1
74Damastas 3 cm5.6Container 1Container 2
75Aphrodite 2 cm4.7Container 1Container 1
76Damastas 3 cm5.5Container 2Container 2
77Aphrodite 2 cm4.5Container 2Container 1
78Damastas 3 cm5.4Container 2Container 2
79Aphrodite 2 cm4.8Container 2Container 1
80Damastas 3 cm5.6Container 2Container 2
81Aphrodite 2 cm4.6Container 3Container 1

02Weight

You know the weight before the weighbridge.

The weight comes from every slab that goes in. If a bundle would take the container or the axles over the limit, the system stops it before it goes in.

  • Weight from every slab
  • Axles within their limits
  • A warning before the limit
Container 1 · weight and axlesWithin limits

Container weight

27.6/ 28.0 t

Front axles

11.1/ 11.5 t

Rear axles

23.4/ 24.0 t

27.6 t from the slabs themselves, before the truck reaches the weighbridge. The axles are within their limits.

03Documents

The paperwork comes out as the door closes.

CMR, packing list, invoice, VGM, certificate of origin and passports, from the bundles that were loaded. The client finds them in the Portal, with a message.

  • No typing
  • Six documents, one shipment
  • In the client's Portal
Container 1 · the documents·

Packing listSH-0427 · Container 1

BundleMaterialSlabsm²kg
71Aphrodite · 2 cm
73Aphrodite · 2 cm
75Aphrodite · 2 cm
77Aphrodite · 2 cm
79Aphrodite · 2 cm
81Aphrodite · 2 cm

Total82 slabs · 491.2 m²

The door is open: the documents come out as soon as it closes.

In the client's Portal, with a message

EmailSMSWhatsApp

The difference
The difference

Transport software knows the truck. Noria knows every slab inside it.

Transport software keeps routes and waybills. Noria knows what every bundle weighs, which container fills up to the limit and which documents the shipment needs.

  • Loading plan

    Which bundle goes in which container.

  • Scanning

    The wrong bundle stops at the door.

  • Weight

    From every slab, before the weighbridge.

  • Axles

    Within their limits, before it leaves.

  • Documents

    CMR, packing list, invoice, VGM.

  • Passports

    For every slab in the shipment.

  • Portal

    The client follows the shipment.

  • Strata AI

    Fewer containers, lower freight costs.

With Strata AI

The AI plans the load.

Strata AI suggests which bundles go into each container and in what order, so you pay to ship fewer containers.

All about Strata AI
Strata AI

You: Will the Aegean Hotels order fit in two containers?

Yes, if bundles 12 to 17 go in first: two containers of 27.4 and 27.8 metric tons. Otherwise you need a third, with another freight charge.

From bundle weights and container limits

Ask

Questions

Loading & dispatch: questions

CMR, packing list, invoice, certificate of origin and the slabs' passports. It takes them from the bundles that were loaded, with no typing.

From the size and material of every slab, or from your weighbridge if it is connected. It warns you before a container goes over the limit.

Yes. Trucks, containers and client pick-ups follow the same flow.

Yes, from the Portal: what was loaded, with photos, the documents and where the shipment is.

The system tells you before it goes in and sends it where it fits: to the other container or the next shipment.

Yes, by email, SMS or WhatsApp, from your own account. The documents and photos are waiting for them in the Portal.

Yes. Every shipment with its containers, what was loaded, the weight and the documents.

See your own stone
inside Noria.

With your blocks and your slabs.