A sawn marble block, opened into slabs, rolled out of the saw on its trolley

Software for marble & granite factories Every block. With its profit.

The block goes into the saw and comes out as slabs, each with its own label. You know the yield, the waste and the cost before the shift ends.

  • The slab is born at the saw
  • Toll processing with its own balance
  • Tiles: lots, shade, pallets
slabs from one block, labelled
42
yield on every block
m²/m³
screen for every machine
1

Noria Strata is software for marble processing factories, including toll cutting and tiles: every slab gets a label at the saw, and every block shows its yield, waste and cost.

Today or with Noria

What changes in the factory from day one.

The block becomes slabs and loses its identity.

Yield comes out at month end, from accounting.

A machine stopped and someone found out in the afternoon.

The line

One block.
42 slabs. All with a name.

The operator presses one button. The system records slabs, labels, yield and cost.

Saw 2 · cutting2 cm · 42 slabs

BLK-2613 · 8,43 m³ · A+

30 / 42 slabs labelled

BLK-2613

8,43 m³ · A+

Saw 2 · cutting

71%

2 cm · 42 slabs

30 / 42 slabs labelled

m² / m³ · target 30
31.2
waste
8%
cost / m²
€18.40

Machines now · m² today

  • Saw 1312 m²
  • Saw 2268 m²
  • Polishing line540 m²
  • CNC bridge saw96 m²

The CNC bridge saw has been idle for 40 minutes. The supervisor was notified.

The cut, in 3D

Cut it in 3D
before the saw does.

Pick 2 or 3 cm and the block opens into its slabs: how many, how many m², the yield against your target. Then each slab gets its label as it comes off the saw.

The block is cut
Illustrative scenario · Profit per block

Every block.
With its profit.

From purchase to the last slab: what it yielded, what it sold for, what it made you. And which block is eating your money.

BLK-1427

Calacatta Borghini

Bought Sep 12 · Quarry K-3

Cost

€ 8,400

Sales

€ 21,300

Profit

€ 12,900

This month's blocks

  • BLK-1427Calacatta Borghini+154%
  • BLK-1431Arabescato Corchia+96%
  • BLK-1388Damastas+61%
  • BLK-1402Camouflage Brown-12%

BLK-1402 lost you money. Noria caught it before the next one.

The essentials

What a factory needs.

All features

Where you start

You can start with production, slabs, tiles and labels alone, even when your blocks come from other quarries. Sales and dispatch go in when you need them. Noria Strata connects to the accounting software you already use.

Read more about our slab inventory management software.

How many slabs will a block give? Count the slabs from a block, saw kerf included.

Illustrative scenario

A factory with three saws.

  1. Before

    Three saws, one polishing line, two shifts. Yield came out at month end and the slabs in the yard had only chalk marks.

  2. The first 30 days

    Every block goes into the saw with its name. Every slab comes out with a label. In the first week you see which block made waste.

  3. Today

    The owner sees the profit from every block and buys from the quarries that deliver a return. The sales team knows where to find every slab.

slabs labelled
100%
month-end reports
0
screen for all production
1

Several businesses or a group? One system.

Quarry and factory? Export and showroom? Activate what you need in the same installation. The block moves through the system without anyone re-entering its details.

Which solution for whom
Questions

What they ask · Processing factories

The system knows the block's volume and the m² that came out. It gives yield, waste and cost per m² while it is cut.

Block, material, grade, sizes, finish and place. One scan with a phone shows its whole history.

Yes. A few big buttons, in their language, on a phone or tablet next to the machine.

Yes. Slabs, tiles and cut-to-size, with stock by size and finish.

You switch those on in the same installation. Blocks from your quarry or bought from others come in with their name, and the slabs leave with their papers.

See your own stone
inside Noria.

With your blocks and your slabs.