
Stone fabrication & countertop software Their kitchen. Before the slab is cut.
The customer picks their slab and sees how their kitchen will look. You see every piece on the slab and every job up to installation.
- Studio: the layout on the real slab
- Projects, line items, phases
- Remnants you sell again
- slab, picked by the customer
- 1
- slab use
- 88%
- steps, from measuring to installation
- 4
What changes in the workshop from day one.
The customer sees a 10 cm sample and imagines the kitchen.
The layout is done in chalk on the slab.
Where is the job? Calls to the installer.
From measuring.
To installation.
Every job is linked to its slab, its pieces and its installation date.
- 1 Countertop 2.4 m
- 2 Island, side
- 3 Island, top
- 4 Cooktop backsplash
- 5 Window sill
Kitchen and island
P. residence · Glyfada
- MeasureMon Nov 4
- Design and approvalWed Nov 6
- CutMon 11/11
- FitThu Nov 14
The customer approved the render and their slab. The installer gets the layout on the phone.
Move the veins.
Before you cut the slab.
Slide the layout over the real slab and the island changes with it: the top and the waterfall from one piece, the veins running on over the edge. Your customer approves it on the phone; the rest of the slab goes to stock as a remnant, with its photo.
Open the bundle.
Before it is cut.
Drag. The slabs open like a book and the veins meet at the seam. Your buyer picks the pair from the Portal.


Calacatta Borghini · every pair numbered, held with one click.
See StudioYOUR CLIENT SEES IT
BEFORE YOU DO.
One photo. Three minutes. Your marble in their space.





Calacatta Borghini
APUAN ALPS
What a fabricator needs.
Where you start
You can start with Studio, projects, stock allocation and slabs alone, without a quarry or a factory. Crews and after-sales go in when you need them. Noria Strata connects to the accounting software you already use.
A workshop with 20 jobs a month.
- Before
Kitchens, bathrooms, stairs. Samples in the office, layout in chalk and the customer asking every day when it will be done.
- The first 30 days
The customer picks the slab and sees the render. The pieces go on the slab. Remnants go into stock for small jobs.
- Today
Less waste, fewer calls, jobs that close faster. The customer has no surprise on installation day.
- slab use
- 88%
- surprises at installation
- 0
- screen for all jobs
- 1
Several businesses or a group? One system.
Quarry and factory? Export and showroom? Activate what you need in the same installation. The block moves through the system without anyone re-entering its details.
What they ask · Fabricators & projects
Upload a photo of the room or choose a sample room. Studio shows the slab they chose in that space, with its veining.
You draw the pieces and place them on a photo of the actual slab. You see material use and waste before you cut.
Yes. You pick consecutive slabs from the same bundle and see how the veins join.
They go into stock with sizes and a photo, and the system suggests them for small pieces.
You see their stock, hold the slab for your customer and start the layout on it.


